faq

What is the production delivery time for heating equipment?


a

Standard integrated heating units take 7-15 working days. For large central heating projects, the delivery time is 20-35 working days after deposit arrangement.

Can the heating heat pump work stably in extremely cold weather?


a

Our low-temperature heating unit adopts enhanced vapor injection technology. It can work steadily at -25℃ ambient temperature without defrosting failure.

What equipment is included in your integrated heating system?


a

The full heating system is composed of an air source heat pump, circulating pump, buffer tank and water filter tank.

< 1234567 > proceed page